Battersea Power Station to Marble Arch by tube
16 min, 1 change, via the Northern & Central lines.
Step by step
- Ride the Northern line — 7 stops, 10 min
- Change platforms — 3 min
- Ride the Central line — 3 stops, 3 min
Questions
- How long does it take to get from Battersea Power Station to Marble Arch?
- About 16 min by tube, with 1 change via the Northern & Central lines.
- How many changes from Battersea Power Station to Marble Arch?
- 1 change, via the Northern & Central lines.
- Which line goes from Battersea Power Station to Marble Arch?
- The Northern & Central lines.
- What zones are Battersea Power Station and Marble Arch in?
- Both stations are in Zone 1, so a Zone 1 ticket covers the journey.
Journey times generated from the London Underground timetable on 2026-11-13. Live service status is shown on the map.
Open the live London Underground map
Do this journey with live arrivals
The Tube Map app plans this route offline, shows live departures and picks the best carriage for your change.