Battersea Power Station to Mile End by tube
22 min, 2 changes, via the Northern, Waterloo & City, Central lines.
Step by step
- Ride the Northern line — 3 stops, 6 min
- Change platforms — 3 min
- Ride the Waterloo & City line — 1 stop, 3 min
- Change platforms — 3 min
- Ride the Central line — 3 stops, 7 min
Questions
- How long does it take to get from Battersea Power Station to Mile End?
- About 22 min by tube, with 2 changes via the Northern, Waterloo & City, Central lines.
- How many changes from Battersea Power Station to Mile End?
- 2 changes, via the Northern, Waterloo & City, Central lines.
- Which line goes from Battersea Power Station to Mile End?
- The Northern, Waterloo & City, Central lines.
- What zones are Battersea Power Station and Mile End in?
- Battersea Power Station is in Zone 1 and Mile End is in Zone 2 — the journey spans Zones 1–2.
Journey times generated from the London Underground timetable on 2026-11-13. Live service status is shown on the map.
Open the live London Underground map
Do this journey with live arrivals
The Tube Map app plans this route offline, shows live departures and picks the best carriage for your change.